{"id":2936,"date":"2026-07-30T10:39:18","date_gmt":"2026-07-30T04:39:18","guid":{"rendered":"https:\/\/silleno.kz\/?p=2936"},"modified":"2026-07-31T16:16:16","modified_gmt":"2026-07-31T10:16:16","slug":"largest-column-of-the-silleno-project-delivered-to-the-construction-site","status":"publish","type":"post","link":"https:\/\/silleno.kz\/?p=2936&lang=en","title":{"rendered":"Largest Column of the Silleno Project Delivered to the Construction Site"},"content":{"rendered":"<p>A fractionation column, the largest vertical piece of equipment for the project, has been delivered to the construction site of the future polyethylene plant. It is the first piece of oversized equipment to arrive directly at the complex\u2019s installation site. The column was manufactured at the AtyrauNefteMash plant.<br \/>\nTechnical specifications of the column:<br \/>\n\u25aa\ufe0f Height \u2013 101.8 metres (higher than a 30-storey residential building);<br \/>\n\u25aa\ufe0f Diameter \u2013 7.5 metres;<br \/>\n\u25aa\ufe0f Weight \u2013 approximately 1,500 tonnes.<br \/>\nThe equipment is at the heart of the pyrolysis unit: it is in this column that ethylene, the key feedstock for polyethylene production, will be separated.<br \/>\nThe transportation route ran from the manufacturing facility in Atyrau to the construction site in the National Industrial Petrochemical Technopark Special Economic Zone. A self-propelled modular transporter was used for transportation, distributing the load so that the axle load did not exceed 10 tonnes. This helped prevent damage to the road surface. Transportation was carried out during daylight hours at a speed ensuring safe movement, approximately 2\u20134 km\/h.<br \/>\nThe delivery of oversized equipment is not merely a logistics milestone; it establishes the technical foundation for the start of active installation works.<br \/>\nOverall, the manufacture of equipment of this scale and technical complexity by a Kazakhstani company marks an important step towards strengthening localisation. The project demonstrates the growing capabilities of domestic manufacturers, creates new opportunities for the industry, and expands the participation of Kazakhstani companies in the implementation of the country\u2019s largest petrochemical projects.<\/p>\n<div style=\"display: grid; grid-template-columns: repeat(3,1fr); gap: 20px; margin-bottom: 20px;\">\n<p><img decoding=\"async\" style=\"width: 100%; height: 300px; object-fit: cover; display: block;\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/07\/img_9432.jpg\" alt=\"\" \/><\/p>\n<p><img decoding=\"async\" style=\"width: 100%; height: 300px; object-fit: cover; display: block;\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/07\/img_9433.jpg\" alt=\"\" \/><\/p>\n<p><img decoding=\"async\" style=\"width: 100%; height: 300px; object-fit: cover; display: block;\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/07\/img_9435.jpg\" alt=\"\" \/><\/p>\n<p><img decoding=\"async\" style=\"width: 100%; height: 300px; object-fit: cover; display: block;\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/07\/img_9436.jpg\" alt=\"\" \/><\/p>\n<p><img decoding=\"async\" style=\"width: 100%; height: 300px; object-fit: cover; display: block;\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/07\/img_9437.jpg\" alt=\"\" \/><\/p>\n<p><img decoding=\"async\" style=\"width: 100%; height: 300px; object-fit: cover; display: block;\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/07\/img_9439.jpg\" alt=\"\" \/><\/p>\n<\/div>\n<div style=\"max-width: 1200px; margin: 0 auto;\"><iframe style=\"width: 100%; height: 500px; border: 0; display: block;\" src=\"https:\/\/www.youtube.com\/embed\/dP2W3GzIWBc\" allowfullscreen=\"allowfullscreen\"><br \/>\n<\/iframe><\/div>\n","protected":false},"excerpt":{"rendered":"<p>A fractionation column, the largest vertical piece of equipment for the project, has been delivered to the construction site of the future polyethylene plant. It is the first piece of oversized equipment to arrive directly at the complex\u2019s installation site. The column was manufactured at the AtyrauNefteMash plant. Technical specifications of the column: \u25aa\ufe0f Height [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2929,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[42],"tags":[],"class_list":["post-2936","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts\/2936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2936"}],"version-history":[{"count":4,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts\/2936\/revisions"}],"predecessor-version":[{"id":2941,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts\/2936\/revisions\/2941"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/media\/2929"}],"wp:attachment":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2936"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}