{"id":2828,"date":"2026-06-19T12:31:03","date_gmt":"2026-06-19T06:31:03","guid":{"rendered":"https:\/\/silleno.kz\/?p=2828"},"modified":"2026-06-23T12:39:51","modified_gmt":"2026-06-23T06:39:51","slug":"first-batch-of-heavy-lift-equipment-arrives-in-kazakhstan-for-the-silleno-plan","status":"publish","type":"post","link":"https:\/\/silleno.kz\/?p=2828&lang=en","title":{"rendered":"First Batch of Heavy-Lift Equipment Arrives in Kazakhstan for the Silleno Plant"},"content":{"rendered":"<p>The first batch of heavy-lift equipment for the polyethylene plant under construction in Atyrau Region has been delivered by two river-sea class vessels. The cargo arrived at the Ersai Port located in the Mangystau Region.<\/p>\n<p>The shipment consists of nine units of equipment for the pyrolysis unit, previously dispatched from the manufacturing facility. The total weight of the cargo is approximately 12,000 tonnes, equivalent to the weight of around 200 loaded railway wagons.<\/p>\n<p>The shipment includes reactors, separators, and columns. The largest item is the Wet Flare Knock Out Drum, weighing 347 tonnes and measuring more than 43 metres in length.<\/p>\n<p>Unloading operations have been completed. The next stage involves transporting the equipment to the construction site located in the National Industrial Petrochemical Technopark in the Atyrau Region.<\/p>\n<p>The Silleno plant, with a production capacity of 1.25 million tonnes of polyethylene per year, is a key investment project in Kazakhstan\u2019s petrochemical industry. The arrival of the first batch of heavy equipment confirms that construction is progressing in line with the approved schedule. The plant is scheduled to commence operations in 2029.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-2630\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/06\/dji_20260607102407_0105_d-scaled.png\" alt=\"\" width=\"400\" height=\"400\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-2630\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/06\/img_4801-scaled.jpg\" alt=\"\" width=\"400\" height=\"400\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-2630\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/06\/img_4874-scaled.jpg\" alt=\"\" width=\"400\" height=\"400\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-2630\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/06\/26e06ad0-7954-4aba-bb6a-044bff23c8fd.jpg\" alt=\"\" width=\"400\" height=\"400\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-2630\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/06\/dji_20260607102900_0114_d-scaled.jpg\" alt=\"\" width=\"400\" height=\"400\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-2630\" src=\"http:\/\/silleno.kz\/wp-content\/uploads\/2026\/06\/6ed4ef52-48c4-4d08-8790-56573009cfc9.jpg\" alt=\"\" width=\"400\" height=\"400\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first batch of heavy-lift equipment for the polyethylene plant under construction in Atyrau Region has been delivered by two river-sea class vessels. The cargo arrived at the Ersai Port located in the Mangystau Region. The shipment consists of nine units of equipment for the pyrolysis unit, previously dispatched from the manufacturing facility. The total [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2819,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[42],"tags":[],"class_list":["post-2828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts\/2828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2828"}],"version-history":[{"count":3,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts\/2828\/revisions"}],"predecessor-version":[{"id":2835,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/posts\/2828\/revisions\/2835"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=\/wp\/v2\/media\/2819"}],"wp:attachment":[{"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/silleno.kz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}